![]() ![]() Eth0 & Eth2 are in active passive bond for a redundant management interface, eth1 is used to provide a secondary backup link for HA. The 2 Kemp LoadMasters are mounted a different row and different rack to spread the risk and maintain high availability. There is a separate out of band network with remote access. All racks have redundant PDUs that are remotely managed over Ethernet. Networking is high to continuously available allowing for planned and unplanned maintenance as well as failure of switches. Hyper-V clusters nodes are spread across racks in different rows. The environment offers rack and row as failure units in power, networking and compute. A highly redundant Application Delivery Controller Setup with KempTechnologies ![]() Needless to say the solution had to be highly available. ![]() The goal was to make sure the KempTechnologies LoadMaster Application Delivery Controller was capable to handle the traffic to all load balanced virtual machines in a high volume data and compute environment. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |